Row of meeting pods with purple benches Image of project

Leeds

Rose Bowl Refurbishment: A New Era for Leeds Beckett University

A Harmonious Blend of Functionality, Innovation, and Well-being

http://university%20lecture%20room.%20Banks%20of%20desks%20all%20at%20one%20level.%20The%20desks%20have%20wheels%20on%20them%20making%20for%20easy%20rearrangement%20of%20the%20room
http://Corridor%20with%20enclosed%20meeting%20pods.%20The%20pods%20have%20glass%20doors%20inside%20you%20can%20see%20purple%20benches
http://University%20office%20kitchen%20and%20breakout%20space
http://university%20office%20with%20desks,%20glass%20meeting%20pod%20and%20breakout%20table
http://University%20class%20room%20with%20partition%20wall%20wide%20angle
http://University%20office%20with%20desks%20and%20breakout%20sofa
http://university%20office%20overview%20with%20a%20variety%20of%20different%20seating%20options

The Vision

Our collaboration with Leeds Beckett University (LBU) involved the intricate refurbishment of workspace within the Rose Bowl building, the home of Leeds business school. The project presented unique challenges, including tight deadlines, live operational environments, and the necessity to minimize disruption to ongoing university activities. Our goal was to transform the space into a modern, functional, and inspiring environment that aligns with LBU’s high standards and future aspirations.

university office with the kitchen in the foreground in the background you can see the breakout spaces and the desks

Stats

Sqft icon

Sq ft

Location icon

Location

Leeds

The Workspace

In redesigning the space we aimed to create an environment that supports both learning and administrative functions while promoting a sense of community and well-being among students and staff. The refurbishment spanned over 5,000 sqft, encompassing teaching spaces on the 3rd and 4th floors, as well as office areas.
We introduced flexible learning spaces with adaptable furniture and movable partitions, allowing the environment to be reconfigured easily for various activities, methods and group sizes. To foster collaboration and informal interactions we dedicated specific areas as breakout zones and group working booths

Embracing biophilic design principles, we incorporated natural materials like wooden flooring and green walls to create a calming atmosphere beneficial for learning and well-being. The modern amenities included state-of-the-art audiovisual equipment, high-speed internet access, and energy-efficient lighting systems, enhancing the functionality and sustainability of the space.
The design focused on a modern yet welcoming ambiance, with clean lines, ample natural light, and a palette of calming pastel colours. This environment not only enhances the educational experience but also reflects the university’s commitment to sustainability and innovation.

The Delivery

Delivering the Rose Bowl project required meticulous planning and coordination, particularly given the live operational environment of the university. The refurbishment was executed in phases to ensure continuous use of the building with minimal disruption.
In the first phase, we prioritised the 3rd and 4th-floor teaching spaces, completing these areas first and handing them over to the university before the new academic year began, ensuring they were ready for use as scheduled. The second phase concentrated on the office spaces, carefully timed to avoid peak periods and ensure the smooth relocation of staff.
To manage construction within a live environment, we employed sustainable hoarding to segregate construction areas, ensuring safety and minimal disruption to students and staff. Regular coordination meetings with LBU’s management and stakeholders facilitated clear communication and timely resolution of any issues. Strategic scheduling allowed us to complete critical upgrades to M&E systems, including interim fire alarms and phased HVAC shutdowns, with minimal impact on building operations. Temporary relocations of staff were arranged as necessary to facilitate uninterrupted work.

University class room with banks of computers
university office space with banks of desks separated by a storage unit

The Outcome

The successful refurbishment of the Rose Bowl at Leeds Beckett University stands as a testament to Chameleon Business Interiors’ expertise in managing complex projects. Our ability to deliver within stringent timelines, coordinate effectively in a live environment, and maintain high standards of quality and safety ensured the project not only met but exceeded client expectations.

Client
Journey

workplace consultancy icon

Workplace
Consultancy

concept design icon

Concept
Design

costings icon

Budgets

detailed design icon

Detailed
Design

procurement icon

Procurement

project delivery icon

Project
Delivery

handover icon

Handover

day 2 care icon

Day 2 Care

Do you have a similar project?
Tell us about it